PacWave is a state-of-the-art, pre-permitted, grid-connected, wave energy test facility that is being developed in partnership with the US Department of Energy, the State of Oregon, Oregon State University (OSU) and local stakeholders. The open ocean test site consists of four berths, which occupy two square nautical miles of ocean with a cable to shore of approximately 12 miles in length (for each berth). Drilling for cable conduits began in summer 2021 and cable laying was completed in fall 2024; however, permitting and cable procurement started long before that. This webinar will describe the cabling process, including pre-installation environmental surveys and post-installation monitoring.